Huawei iSitePower-M - Battery Storage and Recharge Guidelines

Huawei iSitePower-M
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
● If there is PV input, turn on the DC SWITCH.
● If there is no PV input, hold down the manual ON/OFF switch for 5s.
Step 2 Turn the AC input switch to ON.
Step 3 Observe the annular strip light. If all green lights are steady on, battery charging is
complete.
Step 4 After the charge is complete, turn
o the upstream AC input circuit breaker of the
iSitePower-M system and then the DC SWITCH. Hold down the manual ON/OFF
switch for 5s to shut down the battery module. If other batteries need to be
charged, repeat the preceding steps.
----End