Figure 3-39 Connecting the power cable
(1) Power cable ports (connecting to L1, L2, L3, from left to right)
(2) PE wiring terminal
3.11.3 Installing the Voltage Jumper
Before connecting the voltage jumper, ensure that the power distributor matches the mains
voltage.
Figure 3-40 shows six voltage jumpers. Select one jumper that matches the local power
voltage and connect the jumper to 11 in Figure A-1.
Figure 3-40 Voltage jumpers
3.11.4 Connecting the Signal Cables