Hardware Installations and Upgrades
30 Intel® Entry Server Chassis SC5299-E UP/DP/WS/BRP User Guide
11. Push drive latch in to lock hard drive into drive bay
Figure 30. Latching Drive Latch
12. Install additional drives as necessary.
Warning: Drive bay slots 1, 3, and 5 MUST be populated first. Failure to do so could result in
thermal issues within the chassis.
Figure 31. Drive Bay Slot Order
AF000320
AF000316
1
2
4
3
5
6