This chapter mainly describes the  basic  guidelines during the  installation  and commission 
procedures  on  the  inverter,  which  you  may  follow  to  install  and  commission  the  inverter 
quickly.   
2.2 Unpacking inspection   
Check as followings after receiving products:   
1. Check that there are no damage and humidification to the package. If not, please contact 
with local agents or INVT offices. 
2.  Check  the  information  on  the  type  designation  label  on  the  outside  of the  package to 
verify that the drive is of the correct type. If not, please contact with local dealers or INVT 
offices. 
3. Check that there are no signs of water in the package and no signs of damage or breach 
to the inverter. If not, please contact with local dealers or INVT offices. 
4.  Check  the  information  on  the  type  designation  label  on  the  outside  of the  package to 
verify that the name plate is of the correct type. If not, please contact with local dealers or 
INVT offices. 
5. Check to ensure the accessories (including user’s manual, control keypad and extension 
card) inside the device is complete. If not, please contact with local dealers or INVT offices. 
2.3 Application confirmation   
Check the machine before beginning to use the inverter:   
1. Check the load  type to  verify that  there  is no  overload  of the inverter during work  and 
check that whether the drive needs to modify the power degree. 
2. Check that the actual current of the motor is less than the rated current of the inverter.   
3. Check that the control accuracy of the load is the same of the inverter.   
4.  Check  that  the  incoming  supply  voltage  is  correspondent  to  the  rated  voltage  of  the 
inverter. 
5. Check that the communication needs option cards or not.