EasyManuals Logo

Johnson Controls YORK YMC2 User Manual

Johnson Controls YORK YMC2
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Manual description Form number
Centrifugal Chiller Long Term Storage 50.20-NM5
All Products - Replacement Parts Electrical Connectors 50.20-RP1
All Products - Replacement Parts Fittings 50.20-RP2
Conditioned based maintenance
Traditional chiller maintenance is based upon assumed and generalized conditions. In lieu of
the traditional maintenance program, a Johnson Controls YORK Conditioned Based Maintenance
(CBM) program can be substituted. This CBM service plan is built around the specific needs for
the chiller, operating conditions, and annualized impact realized by the chiller. Your local Johnson
Controls Branch can propose a customized Planned Service Agreement that leverages real time
and historical data, delivering performance reporting, corrective actions required and data enabled
guidance for optimal operation and life cycle assurance. The program will include fault detection
diagnostics, operation code statistics, performance based algorithms and advance rules based
rationale delivered by the Johnson Controls Connected Equipment Portal.
Nomenclature
Figure 1: System nomenclature
Figure 2: Compressor nomenclature
9
YMC
2
Mod B with OptiView
Control Center

Table of Contents

Other manuals for Johnson Controls YORK YMC2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Johnson Controls YORK YMC2 and is the answer not in the manual?

Johnson Controls YORK YMC2 Specifications

General IconGeneral
BrandJohnson Controls
ModelYORK YMC2
CategoryChiller
LanguageEnglish

Related product manuals