90 °C
60 °C
40 °C
Page 51 / 96
9.12. SANARIUM S - Preparing the evaporator
1
3
2
1. Open the angle valve (1) for the
water inlet.
2. Switch on the illuminated switch (2)
on the evaporator.
Once the evaporator is ready, the
green OPERATION LED lights up.
If the yellow or red LED (3) lights
up:
Carry out maintenance as
described on page 92.
The controller automatically switches the evaporator on.
4
Birmingham scent dispenser
1. Check the fill capacity on the scent
container (4).
D Replace the scent container.
D See "Cleaning and maintenance" -
page 93.