5.5 Initial commissioning of the grinding machine
Place the grinding machine at the installation site on a level base.
Level out floor unevenness by adjusting the machine feet (3-2/11) with a flat wrench (SW17)
taking care to ensure that there is a slight downward slope towards the back.
Have an authorized electrician on site install the voltage supply.
Completely install and check the safety devices before commissioning.
Have all the safety devices checked for proper function by trained
personnel before commissioning.
CAUTION
Have the compressed air supply installed on site by a qualified expert.
Confirm that the machine is correctly connected to the compressed air
supply.
If the machine is connected incorrectly, escaping compressed air and
hurtled parts can lead to injuries.
Observing the local safety and accident prevention regulations for
compressed air is required.
CAUTION
5. Installation