EasyManua.ls Logo

Kramer 348

Kramer 348
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA 348-01 * 2.0 * 34801b340.fm 3-95
Operation 3
Backfilling round gravel and precise unloading
Precise dosing and placement of pourable material
Bucket teeth move back from the wall as the bucket opens
Unloading from the bottom of the bucket for increased tilt-out heights
Unloading from the bottom of the bucket for increased tilt-out heights
Tilt-out height can be increased by at least 55 cm (depending on bucket size), as
compared to tilting out normally with a standard bucket.
Notice!
Smaller tilt reach is compensated by pushing the material with the open
multipurpose bucket as shown.
Ansicht_012.iso
Ansicht_011.iso
Fig. 134 : Backfilling and unloading material with
a multipurpose bucket
Ansicht_010.iso
Ansicht_013.iso
Fig. 135 : Unloading from the bottom of a multipurpose
bucket

Table of Contents

Related product manuals