Operation
242
Pos: 49.60.22 /BA/Bedi enung /Rundballenpr esse/Netz-Garnbind ung/Garn führen @ 342\ mod_1432729109535_78. docx @ 2589333 @ @ 1
VP150202_1
1
3
3
2
7
6
1
4
5
7
8
GF000001
Fig. 188
• Guide the four twines straight down through the twine guides (1) in the twine box without
crossing them. Thread one twine each into one eye (2).
• Guide the twine coming from above through the twine retainers (3) and further downward to
the both twine brakes (4).
• Guide two twines each through the eyes (5) of the both twine brakes (4) and further on, as
shown in detail GF000001.
Note
Make sure that the twine is between screws (6) and spring compressors (7).
• Guide the both twines from the upper twine brake to the stepped pulley (8).
Pos: 49.60.23 /Layout Module /---------------Seitenumbruch------------- --- @ 0\mod_1196175311226_0. docx @ 4165 @ @ 1