3-23
Maintenance > Parts Cleaning
34
Attach the stop ring.
35
Move the lever for retard pressure to the original position.
36
Attach the right rail bracket, and fasten each two screws on
right and left side of horizontal conveying upper guide..
37
Attach the feed roller drive assy.
Tilt the unit slightly to the right when viewed from the front of the main unit, and then hook it.
38
Fasten a screw on each side of the rail of deck feed unit.
39
Move the deck feed unit to its original position.
Make sure that attached shaft is on the position shown below.