169441 248 Revision D
5.2.3 Stub Guard Conversion Kit
Stub guards, complete with top guides and adjuster shoes, are designed to cut tough crops.
Figure 5.6: Stub Guards
This kit is available for 4.6, 6.1, and 7.6 m (15, 20, and 25 ft.)
D60 Draper Headers. Installation and adjustment instructions
are included in the kit.
Order one of the following bundles according to your
header size:
• 4.6 m (15 ft.) – MD #B5009
• 6.1 m (20 ft.) – MD #B5010
5.2.4 Vertical Knife Mounts
The vertical knife mounts allow the installation of vertically oriented knives onto both ends of the header.
Figure 5.7: Vertical Knife Mount
The vertical knives themselves are not sold by MacDon and
must be purchased from a separate supplier.
Installation and adjustment instructions are included in the
bundle.
Order the following bundles according to left or right side:
• Left side: MD #B4842
• Right side: MD #B4843
NOTE:
The Left Vertical Knife Mount kit can only be installed if installing
both sides.
NOTE:
If mounting onto multiple headers, you will also require the
auxiliary vertical knife plumbing kit MD #B5406.
OPTIONS AND ATTACHMENTS