EasyManuals Logo

Manitowoc 14000 User Manual

Manitowoc 14000
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #253 background imageLoading...
Page #253 background image
Reference Only
Manitowoc Published 03-29-17, Control # 064-23 v2 4-115
14000 OPERATOR MANUAL SETUP AND INSTALLATION
4
FIGURE 4-57 continued
R
F
2
1
3
S7
S6
S5
S4
S3
S2
S1
2
3
1
R
F
2
1
3
S7
S6
S5
S4
S3
S2
S1
2
3
1
Item Description Item Description
1 Boom Top Wire Rope Guide F Front Drum (Drum 1)
2 Upper Boom Point (see Figure 4-56
) R Rear Drum (Drum 2)
3 Load Block — 220 USt (199,6 t)
6064-7_8
13.8 ft
4,2 m
18.4 ft
5,6 m
15.3 ft
4,7 m
19.9 ft
6,1 m
NOTE: Load block (3) to Lower Boom Point
(2) minimum distance is controlled
by 2-1/2° fleet angle
8 Parts of Line
7 Parts of Line
Dead-End Socket And Wedge
Block-Up Limit Weight

Table of Contents

Other manuals for Manitowoc 14000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 14000 and is the answer not in the manual?

Manitowoc 14000 Specifications

General IconGeneral
BrandManitowoc
Model14000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals