Maintenance overview
5.2 Maintenance plans
07.12.2017
Maintenance manual 3 302 649 en 5 - 5
GMK4090
Maintenance work on the SUPERSTRUCTURE:
Daily/before putting into operation
Hydraulic system
– Check the oil level à p. 8 - 31
Hoist ropes
– Checking the winding à p. 8 - 51
Electrical system
– Checking the lighting and indicators à p. 8 - 73