Maintenance work on the carrier
7.9 Axle lines
7 - 62 3 302 649 en Maintenance manual
GMK4090
07.12.2017
7.9.5 Final drives – changing the oil
Oil, spare parts,
tools
1)
Additional equipment (2nd driven axle line)
– Drain channel.
– Receptacle, about 5 l (1.5 gal); à p. 2 - 4.
Prerequisites – The truck crane must be raised on outriggers.
– The engine is not running and is secured against unauthorised use;
à p. 2 - 3.
– The parking brake is released.
Gear oil
in litres (gal)
Designation
acc. to
DIN 51502
Specifications
Classification
GROVE part no.
for each final
drive:
2,7 (0,7)
C - LPF MIL-L 2105 B
API-GL-5
Viscosity:
Hyp SAE 90
ISO - VG 220
00552891
for drive Designation Quantity GROVE part no.
8 x 6 x 8 Gasket 24 x 29 Cu DIN 7603 6 00117145
8 x 8 x 8
1)
Gasket 24 x 29 Cu DIN 7603 8 00117145
O
Risk of environmental damage due to leaking consumables
Always let consumables drain into suitable receptacles. Wipe up any
consumables that escape.
Store/dispose of consumables and any soaked equipment properly.
Ask about the applicable regulations.