Maintenance overview
5.4 Measures required for winch monitoring
07.12.2017
Maintenance manual 3 302 649 en 5 - 25
GMK4090
The general overhaul is to be arranged by the operator and performed by
the manufacturer or a representative authorised by the manufacturer.
The results are to be entered in the crane logbook.
The manufacturer or an authorised representative will specify a new theo-
retical service life D upon completion of the general overhaul.
The next general overhaul must be performed within 10 years at the latest.
Alternative
provision
If after 10 years the theoretical service life has not been used up the winch
can continue to be operated without a general overhaul under the following
conditions:
The crane expert has confirmed that the used proportion of the service life
is correct and useful by signing his/her name in the crane test book after
every inspection.
In this case the crane inspector must closely inspect the winch. This includes
at least:
– A visual examination of the exterior (for leaks, damage, deformation etc.),
– An oil inspection (especially for metallic residues),
– A load inspection with minimum and maximum rope pull and each at
maximum possible speed. At least one position is to be wound. Pay
attention to any unusual noises during the load inspection.
This inspection must be confirmed in the crane logbook by the approved
crane inspector and there must be a statement on continued operation
for the winch. The next inspection must take place before the end of
the 12th year of operation and must be repeated every year thereafter.