EasyManuals Logo

Manitowoc Grove RT9130E-2 Service And Maintenance Manual

Manitowoc Grove RT9130E-2
360 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #107 background imageLoading...
Page #107 background image
Grove Published 11-22-2016, Control # 345-12 2-65
RT9130E-2 SERVICE MANUAL HYDRAULIC SYSTEM
2
Checking Charge Air Cooler Motor Control
Valve – For Tier 3 ONLY
1. Install pressure check diagnostic quick disconnect
(Parker PD240) with gauge onto test nipple at Charge
Air Cooler Motor Control Valve
2. With engine at full RPM, unplug harness connection on
control solenoid to turn cooler on. Adjust relief valve to
obtain a reading of 1000 ± 50 PSI (6.9 ± 0.4 MPa). Turn
in to raise, out to lower.
3. Remove pressure gauge and plug harness connection
back into control solenoid.Cylinders

Table of Contents

Other manuals for Manitowoc Grove RT9130E-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT9130E-2 and is the answer not in the manual?

Manitowoc Grove RT9130E-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT9130E-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals