Manitowoc Published 11-20-19, Control # 234-19 4-129
MLC300 OPERATOR MANUAL SETUP AND INSTALLATION
See Figure 4-87 for the remaining steps.
6. Unpin and remove the hose storage bracket (15, View
D) from the right side of the rotating bed. Place the
bracket to the side for use later.
7. Using the switch on the remote control, drive the trolley
(7) rearward until the drive pinions just disengage the
gear rack teeth on the underside of the trolley rails.
8. Support the energy chain (18) with a lifting sling from an
assist crane.
9. Disconnect the hydraulic hoses (9, View D) from the
couplers on the bulkhead (13).
10. Disconnect the electric cable (10, View D) from the
receptacle (A) on the bulkhead (13).
11. Lower the energy chain onto the trolley and secure it
with plastic wire ties.
12. Disconnect the lifting sling.
13. Position the forks from a forklift under the VPC trolley (7)
at the locations shown in View A.
14. Remove the trolley installation guides (1, View D,
Figure 4-85 on page 4-126
).
15. Guide the VPC trolley off the trolley rails with the forklift
and place the VPC trolley onto blocking so it can be
prepared for shipping.
16. Thoroughly clean the hydraulic couplers, the terminator
plug, the electric receptacle, and the dust caps on the
bulkhead (13).
17. Disconnect the CAN terminator plug (14, View D) from
the receptacle (B) and connect it to the receptacle (A) on
the bulkhead (13, View C).
18. Connect dust caps to the hydraulic couplers on the
bulkhead (13, View C).
See Figure 4-85 on page 4-126
for the remaining steps.
19. Remove the pins (3, View B) from the installation
position.
20. Remove the pins (4, View B), the stop blocks (5), and
the wear pad brackets (6) from the installation position.
21. Remove the trolley installation guides (1, View B) from
the installation position.
22. Install the trolley installation guides (1, View A) in the
working/shipping position and secure them with the
safety pins (2).
23. Install the wear pad brackets (6, View A), the stop blocks
(5), and the pins (4) in the working/shipping position.
Secure them with the pins (3).
CAUTION
Avoid Damage to Components
Make sure there are no components (dust caps, electric
cables, hoses, and the like) in the way along the right side
of the rotating bed. The travel path for the trolley and
energy chain must be clear, or damage will occur.