3030226 Rev. D 3-12 System Operation
3.4.1 Storage Heat Procedure
Materials Required:
• Cleaning/disinfection log
NOTE:
Read and understand instructions before beginning procedure.
1. Connect the water inlet line to the water supply. Connect the waste line to a
functional drain. Ensure that the product line is connected between the product
and return ports on the RO. Turn the RO and water supply on.
CAUTION:
Water to be used must be chlorine free or damage to the RO membrane may
result.
NOTE:
You can leave the RO in STORAGE HEAT for 30 days. If you require longer storage,
you will need to connect the RO to utilities and flush the system for 15 minutes
prior to putting the RO back into STORAGE HEAT.
2. Press and hold the blue banner on the top of the Main Screen that says PRESS
AND HOLD FOR CLEANING MODES.