EasyManua.ls Logo

mecalac TA3SH - Standard Operating Procedures; Pre-Operation Checks and ROPS Setup

Default Icon
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TA3H, TA3SH & TA3.5SH Page 7 - 1
7. Standard Operating Procedures
7 Standard Operating Procedures
Before using this equipment the operator must read and fully understand this Instruction Manual
and pay particular attention to Section 2 - Safety and Section 4 - Description which describes the
major components of the machine and the layout and function of all the controls.
7.1 Pre Start Checks
Make sure the machine has been cleaned to enable leaks etc. to be noticed easily during the pre-
start check and during normal operation.
7.2 To Set the ROPS in the Work Position.
Refer to figure 7.1
Figure 7.1. - ROPS pins
1 Lynch Pin
NOTICE
ALL Operators of this machine must be authorised, mentally and physically capable of operating
this machine and fully trained in its operation.
PROCEDURE
1. Check general condition of machine - missing parts, loose fasteners, fuel lines for
damage, hydraulic hose end fittings for leakage, hose outer covers for ballooning, etc.
2. Check engine and hydraulic oil levels - make sure the engine and hydraulic tank are filled
using clean oil and a clean container.
3. Check fuel tank is full - make sure the tank is filled when the engine is cold and the
machine is in a well ventilated area, with the engine stopped using clean fuel and
container. It is advisable to fill the tank at the end of a working session to prevent
condensation forming in the tank during long periods of inactivity, e.g. overnight.
4. Check battery and battery cable condition.
5. Check for adequate ventilation if the machine is to be started or run in a building etc.
6. Make sure the ROPS is in the “work” position.
COV00029
2
1

Table of Contents

Related product manuals