Page 7 - 8 TA3H, TA3SH & TA3.5SH
7. Standard Operating Procedures
(2) To Lower the Skip
(3) To Tip the Load - Swing Skip Machines
Refer to Figure 7.8
(4) To Lower the Skip
(5) To Rotate and Tip the Skip
PROCEDURE
1. Position the machine where the load is to be discharged.
2. Make sure the area is clear of bystanders.
3. Push the control lever forwards towards the front of the machine; the skip will tip and the
load will be discharged.
PROCEDURE
1. When the load has been discharged.
2. Move the control lever towards the back of the machine.
3. The skip will lower.
PROCEDURE
1. Position the machine where the load is to be discharged.
2. Make sure the area is clear of bystanders.
3. Push the control lever forwards towards the front of the machine; the skip will tip and the
load will be discharged.
PROCEDURE
1. When the load has been discharged.
2. Move the control lever towards the back of the machine.
3. The skip will lower.
PROCEDURE
1. Position the machine where the load is to be discharged.
2. Make sure the area is clear of bystanders.
3. Push the control lever forwards towards the front of the machine to raise the skip by 75mm
to enable the catch to clear the skip lock.
4. Move the control lever to the right or left; the skip will rotate.
5. Push the control lever forwards; the skip will tip and the load will be discharged.