EasyManua.ls Logo

Milltronics HydroRanger Plus - Page 23

Milltronics HydroRanger Plus
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LEVEL SYSTEM SYNCHRONIZATION
When multiple ultrasonic level monitors are installed within a single plant/facility,
ensure the transducer cable(s) of each system are run in separate grounded metal
conduits. Otherwise, synchronize the level monitors.
When level monitors are synchronized, no unit can transmit while another is awaiting
echo reception.
To synchronize the HYDRO+ with a DPL+, XPL+, and/or another HYDRO+...
1. Mount the level monitors together in one cabinet.
2. Use a common power (mains) supply and ground (earth) for all units.
3. Interconnect the SYNC terminals of all level monitors.
To synchronize the HYDRO+ with other Milltronics
ultrasonic level monitors contact Milltronics
or your local distributor.
HYDRO +
# 1
HYDRO +
# 2
to next
device
Wall Mount
HYDRO +
# 1
HYDRO +
# 2
to next
device
Rack or Panel Mount
INSTALLATION
PL-507 23

Table of Contents

Related product manuals