햴
Complete the POU “Process” to read as follows:
Save the Project, Close all open dialogues and rebuild the project.
Transfer the project to the PLC and monitor this network using the Monitor button on the
toolbar:
Modify the value of the input variable “Deg_F_Real” and observe the output result on the dis
-
play. Note the 7 Digit floating point accuracy.
Training Manual GX IEC Developer 6 - 13
Functions Functions and Function Blocks