EasyManua.ls Logo

Motorola ASTRO XTSTM 2500 - 5 Performance Checks; Introduction to this Section; Setup; Figure 4. Radio Alignment Test Setup

Motorola ASTRO XTSTM 2500
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Performance Checks
5
Introduction to
This Section
This section covers performance checks used to verify that the radio meets
published specifications. The recommended test equipment listed in the previous
section approaches the accuracy of the manufacturing equipment, with a few
exceptions. Accuracy of the equipment must be maintained in compliance with the
manufacturer’s recommended calibration schedule. Checks should be performed
if radio performance degradation is suspected.
Setup Supply voltage can be connected from the battery eliminator. The equipment
required for alignment procedures is connected as shown in the “Radio Alignment
Test Setup” diagram (Figure 4).
Figure 4. Radio Alignment Test Setup
BNC
COMPUTER
AUDIO GENERATOR
SINAD METER
AC VOLTMETER
TX
RX
30 dB PAD
30 dB PAD
RF GENERATOR
SYSTEM ANALYZER
OR COUNTER
WATTMETER
BATTERY
ELIMINATOR
0180305G54
TRANSMIT
RECEIVE
RADIO
PROGRAM/TEST CABLE
RKN4106
AUDIO IN
SET TO APPROX. 450mV FOR Tx
MEASURE 80mV FOR Tx
SMA-BNC
58-80348B33
TEST SET
RLN-4460

Table of Contents

Other manuals for Motorola ASTRO XTSTM 2500

Related product manuals