EasyManua.ls Logo

MP Aquinity 2 E - Module Attachment; Vent Filter Attachment

MP Aquinity 2 E
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and start up
membraPure GmbH
Wolfgang-Küntscher-Str.14
16761 Hennigsdorf
Germany
Tel.: +49 (0) 3302/201-20 0
Fax.: +49 (0) 03302/201-20 21
E-Mail: info@membrapure.de
Internet: www.membrapure.de
page 21
4.7 Module attachment
Figure 12: Modules
- Open the side panels.
- Connect the tubes correspondently to their markings and push them to the stop.
Tubes have to be locked with the union nut.
For the first please install only the pretreatment module ProPak-R10 and the
conditioning module. The polisher module UPW-Pak will be installed during the
initial start-up program later.
4.8 Vent filter attachment
- Unpack the vent filter with CO
2
trap.
- Screw the vent filter clockwise to the filter socket on the tank cap.
pretreatment module
ProPak-R10
(black arrow)
Conditioning module
(red arrow)
polisher module
UPW-Pak (blue arrow)

Table of Contents