Installation and start up
membraPure GmbH
Wolfgang-Küntscher-Str.14
16761 Hennigsdorf
Germany
Tel.: +49 (0) 3302/201-20 0
Fax.: +49 (0) 03302/201-20 21
E-Mail: info@membrapure.de
Internet: www.membrapure.de
The system prompts to install the pretreatment module
ProPak-R10 and the conditioning module now*
- Please install the pretreatment module ProPak-R10
and the conditioning module (see chapter 4.5, 4.7).
- Confirm the entry
*if the system has no UF-Modul (RE / AL / AL.TI), polisher modul (UPW-Pak)
should be installed now
For the period of 1 hour* the pretreatment module ProPak-
R10, the reverse osmosis module and the conditioning
module are going to be flushed
*Aquinity² E : 1 hour
*Aquinity² P : 15 mins
If the conductivity of the permeate is less than 20 µS/cm
and the conductivity of the (EDI)-deionized permeate is less
than 0,1* µS/cm, the tank is going to be filled until 50%
*Aquinity² E : 0,1 µS/cm
*Aquinity² P : 2 µS/cm
Following the ultra pure water part will be flushed for:
- 45 minutes (with UF-Modul) OR
- 5 minutes (without UF-Modul)
The system prompts to install the polisher module UPW-Pak
now*
- Please install the polisher module UPW-Pak (see
chapter 4.5, 4.7).
- Confirm the entry
*this step is only available for the system with UF-Modul
For the period of 5 minutes the polisher module UPW-Pak is
going to be flushed.