EasyManuals Logo

Palm Tungsten T2 User Manual

Palm Tungsten T2
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #187 background imageLoading...
Page #187 background image
Checking off a To Do List item
173
To set the priority of a To Do List item:
1. Tap the Priority number on the left side of the To Do List item.
2. Select the Priority number that you want to set (1 is most important).
Checking off a To Do List item
You can check off a To Do List item to indicate that you’ve completed it. You can
set the To Do List to record the date that you complete the To Do item, and you can
show or hide completed items. See “Setting To Do Preferences” later in this chapter.
To check off a To Do List item:
Tap the check box on the left side of the item.
TIP You can also highlight the item you want to check off, and then press Select on
the navigator.
Changing To Do List item details
The To Do Item Details dialog box enables you to change settings for individual
items.
Select
priority
Tap h e r e
Completed
To Do item

Table of Contents

Other manuals for Palm Tungsten T2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Palm Tungsten T2 and is the answer not in the manual?

Palm Tungsten T2 Specifications

General IconGeneral
BrandPalm
ModelTungsten T2
CategoryPDA
LanguageEnglish

Related product manuals