EasyManua.ls Logo

Pentair FLECK 5810 SXT - Regeneration Cycle Step Duration

Pentair FLECK 5810 SXT
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 5810 - SXT - Programming
Ref. MKT-IM-016 / C - 08.06.2018 65 / 106
6.5.13. Regeneration cycle step duration
Set the duration in minutes of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
Note
The abbreviations used are listed on chapter 6.5.13.1.
6.5.13.1 Regeneration abbreviations
6.5.13.2 For pre-set regeneration cycles
B1 First backwash RF Refill
B2 Second backwash RR Rapid rinse
BD Brine draw SP Service position
BF Brine fill SR Slow rinse
BW Backwash SV Service position
LC Last cycles
AC Press or to set the regeneration cycle step duration.
AD Press to validate the selection and move to the next parameter.

Table of Contents

Other manuals for Pentair FLECK 5810 SXT

Related product manuals