Installer Manual Fleck 5810 - SXT - Maintenance
Ref. MKT-IM-016 / C - 08.06.2018 91 / 106
9.2.10. Meter replacement
No. Operation
A Remove the meter clip (1) using a flat screwdriver on the dedicated slot (2).
B Remove the meter (3) using pliers.
C Change the meter (3).
D Lubricate all seals with approved silicone lubricant only.
E Reverse above procedure steps to rebuild.