EasyManua.ls Logo

Pentair FLECK 5810 SXT - Operation During a Power Failure

Pentair FLECK 5810 SXT
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 5810 - SXT - Operation
Ref. MKT-IM-016 / C - 08.06.2018 79 / 106
8.4. Operation during a power failure
Current valve position, cycle step time elapsed, and time of day is stored 48 hours during a power
failure, and will be restored upon power restoration;
in regeneration, when power is shutting down, the controller saves the current regeneration
data. When power is restored, the controller resume the regeneration cycle at the point where
power failed;
Caution
Without power, the valve stay in its current position. The system should include all required
safety components to prevent overflows.
all the program settings are stored in a permanent memory;
time is kept during a power failure and the time of day is adjusted upon restoration of the power
(as long as the power is restored within 48 hours);
the time of day on the main display screen will flash when there has been a power failure;
the flashing of the time of day can be stopped by pressing any button on the display.

Table of Contents

Other manuals for Pentair FLECK 5810 SXT

Related product manuals