8.6
Appendices
Pinnacle Operators Manual
Pickering Laboratories Inc.
5.2.6 Enable the instrument. This will cause the Pinnacle to heat the column to the temperature set in
the method created in Step 5.2.3
5.2.7 Allow enough time for the temperature to stabilize, and then record the temperature of the
column heater. The specifications for the column heater accuracy are in the Installation /
Operational Qualification of the Pinnacle PCX Data Sheet, Section 8.3 of the Operators Manual
for the Pinnacle PCX.
Does the equipment operate properly? YES / NO
5.3 Comments: _______________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
6.0 MAINTENANCE PROCEDURES: Date Initials
6.1 Are maintenance procedures (per Section 5 of the Operators Manual of the
Pinnacle PCX) scheduled as part of the Preventative Maintenance System?
YES / NO ________ __________
6.2 Is an Equipment Activity Log available? YES / NO ________ __________
7.0 INSTALLATION / QUALIFICATION ACCEPTANCE:
7.1 Criteria:
The equipment, as described in Section 3.2 of the Installation/Operational Qualifications of the Pinnacle
PCX, will be successfully installed and qualified if all equipment components are in place and operating
within the parameters and specifications originally set forth above. Any deviations or changes will be
noted with justification in the Section 5.3, Comments.
7.2 Approvals:
7.2.1 Installation/Operation Qualification:
These signatures verify that the equipment, as described in Section 4.2 of the Installation
Operational Qualifications of the Pinnacle PCX, meets the criteria for proper Installation
Operation Qualification.
Approved by (Quality): ________________________________ Date: ______________
Approved by (Management): ____________________________ Date: ______________