8.7
Appendices
Pinnacle Operators Manual
Pickering Laboratories Inc.
Installation/Operational Qualitication of the Pinnacle PCX Data Sheet
Serial Number:
Customer:
120V or 240V Asset:
Installation Qualification Check List
Are all of the contents listed on the packing list present? Yes / No
Is there enough bench space between the HPLC and detector so the Pinnacle Column Heater
Door and Pinnacle Cover can open without obstruction?
Yes / No
Is there at least 3 inches behind the Pinnacle PCX for ventilation? Yes / No
Is there any damage on the outside of the Pinnacle PCX? Yes / No
Is there any damage inside the Pinnacle PCX? Yes / No
Are all electrical connections secure? Yes / No
Is the gas source regulator set to a maximum of 75 psi? Yes / No
Is a waste bottle provided by the user? Yes / No
Is the HPLC correctly deadheaded? Refer to Section 3.9 or the Operators Manual for the
Pinnacle PCX.
Yes / No
Does the display turn on when the Pinnacle PCX is powered on? Yes / No
Do the valves find home position when the Pinnacle PCX is turned on? The home position is when
the āVā on the valve is between 2 and 3.
Yes / No
Does the gas toggle valve turn the gas on and off? Yes / No