EasyManua.ls Logo

Pickering Laboratories Pinnacle PCX - Installation;Operational Qualification of the Pinnacle PCX Data Sheet

Default Icon
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.7
Appendices
Pinnacle Operators Manual
Pickering Laboratories Inc.
Installation/Operational Qualitication of the Pinnacle PCX Data Sheet
Serial Number:
Customer:
120V or 240V Asset:
Installation Qualification Check List
Are all of the contents listed on the packing list present? Yes / No
Is there enough bench space between the HPLC and detector so the Pinnacle Column Heater
Door and Pinnacle Cover can open without obstruction?
Yes / No
Is there at least 3 inches behind the Pinnacle PCX for ventilation? Yes / No
Is there any damage on the outside of the Pinnacle PCX? Yes / No
Is there any damage inside the Pinnacle PCX? Yes / No
Are all electrical connections secure? Yes / No
Is the gas source regulator set to a maximum of 75 psi? Yes / No
Is a waste bottle provided by the user? Yes / No
Is the HPLC correctly deadheaded? Refer to Section 3.9 or the Operators Manual for the
Pinnacle PCX.
Yes / No
Does the display turn on when the Pinnacle PCX is powered on? Yes / No
Do the valves find home position when the Pinnacle PCX is turned on? The home position is when
the ā€œVā€ on the valve is between 2 and 3.
Yes / No
Does the gas toggle valve turn the gas on and off? Yes / No

Table of Contents