II
Pinnacle Operators Manual
Pickering Laboratories Inc.
3.1 Section 3 Installation
Site Requirements 3.2
Instrument Unpacking and Preparation 3.4
Unpacking 3.4
Gas Connections to Back Panel of Pinnacle PCX 3.5
Computer Connections 3.6
Software Installation 3.6
Pump and Autosampler Connections 3.8
Eluant Priming 3.10
Column and Guard Installation 3.10
Detector Connections 3.11
Reservoir Connections 3.12
Reagent Pump Preparation 3.13
Running a Chromatogram 3.14
Shutdown 3.15
4.1 Section 4 Pinnacle PCX Operation
Software Overview 4.1
Status Window 4.2
Menu Options/Functions 4.4
File
Control
Method
Sequence
Instrument
Configuring your Pinnacle PCX 4.6
Log Files 4.7
Creating and Editing Methods 4.7
Creating and Editing Sequences 4.10
Tutorials 4.11
Running post-column analysis using Pinnacle PCX 4.14
STOP/RESET Pinnacle PCX 4.17
Pinnacle Shutdown 4.17