Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch/Router
BSP-360
64
4.6.4 PoE Alive Check Configuration
The Renewable Energy Switch can be configured to monitor connected PD’s status in real-time via ping
action. Once the PD stops working and responding, the Renewable Energy Switch are going to restart PoE
port power, and bring the PD back to work. It will greatly enhance the reliability and reduces administrator
management burden.
This page provides you with how to configure PD Alive Check as the screen in Figure 4-6-6 appears.
Figure 4-6-6: PD Alive Check Configuration Web Page Screen