EasyManuals Logo

Promise Technology Pegasus32 R6 User Manual

Promise Technology Pegasus32 R6
267 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #107 background imageLoading...
Page #107 background image
91
Managing the Pegasus32Pegasus32 Product Manual
Managing Background
Activities
Background activity management includes:
• “Viewing Current Background Activities”
• “Viewing Scheduled Background Activities”
• “Adding a Scheduled Background Activity”
• “Changing a Background Activity Schedule”
• “Enabling or Disabling a Scheduled Background Activity”
• “Deleting a Scheduled Background Activity”
• “Media Patrol”
• “Redundancy Check”
• “Initialization”
• “Rebuild”
• “Migration”
• “PDM”
• “Transition”
• “Synchronization”
Background activities perform a variety of preventive and remedial functions on your physical drives,
disk arrays, logical drives, and other components.
You can run a background activity immediately or schedule it to run at a later time. Scheduling options
are described below.
Setting options for each activity are listed after the scheduling options. These settings determine how
the background activity affects I/O performance.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology Pegasus32 R6 and is the answer not in the manual?

Promise Technology Pegasus32 R6 Specifications

General IconGeneral
BrandPromise Technology
ModelPegasus32 R6
CategoryStorage
LanguageEnglish

Related product manuals