2 Installation and Quick Startup
2.1 Package Contents
Before you begin installing the Switch, confirm that your package contains the following items:
• One Layer 2/3/4 Managed ToR Switch
• Mounting kit: 2 mounting brackets and screws
• Four rubber feet with adhesive backing
• Redundant AC power cord