© İnnosis Makine 18
2-3 Starng and Controls
Before start-up the following checks must be carrying done by the assigned operator:
➢ Check if all the control levers are in the neutral posion
➢ Make sure that the emergency buon is operaonal. To reacvate rotate a lile clockwise
➢ Check the hydraulic oil level in the relave tank and in the reducers, is as described in the
maintenance chapter of this manual;
➢ Check if the hydraulic tubes are connected in a safe way and that they don’t have
bolenecks
➢ Clean the tracks of any soil and stones.
Note: If the machine is starng aer one or more days of not being used (inacvaon) it is
necessary to consult the maintenance programs and follow up on all the instrucons, before
starng up the machine. This should be done if the machine has not been operang for a long
me.
We strongly recommend preparing a pre-start-up checklist See Appendix E which forms part of
this document.
Fig.6 Protecon screen
The operator should lower the protecon screen (oponal), to have access to the starter frame,
placed on the basis level as shown in the gure 6. The main purpose of the protecon screen is
to protect the operator on standing posion by the control panel when machine is moving.