3-4 Pile Driving
Before starng work, the operator has to limit the area of the construcon site in which
the pile driver will be moving and in which piles will be installed (standard work). Same
goes to supplementary funcons with dierent accessories.
Aerwards, the operator will bring the pile driver to the place where he wants to carry
out the work and will posion it accordingly. The pile driver has to be set in a precise
working locaon in order to drive the piles. The operator manoeuvres the machine by
adjusng the levers of the distributor.
A level, placed on the column (see gure 15).