3-4 Pile Driving
Before starng work, the operator has to limit the area of the construcon site in which
the pile driver will be moving and in which piles will be installed (standard work). Same
goes to supplementary funcons with dierent accessories.
Aerwards, the operator will bring the pile driver to the place where he wants to carry
out the work and will posion it accordingly. The pile driver has to be set in a precise
working locaon in order to drive the piles. The operator manoeuvres the machine by
adjusng the levers of the distributor.
A level, placed on the column (see gure 15).