EasyManua.ls Logo

Quantum 800 - Rubber Track Equipment Maintenance Tips

Quantum 800
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© İnnosis Makine 47
Do the following maintenance aer 500 operang hours and every 500 working hours:
Change the diaphragm in the hammer head and restore the nitrogen level
The checks and maintenance to be carried out every 250/500 hours have to be done regularly,
consulng the present manual of use and maintenance as well as the one concerning the
hammer.
Yearly check or aer 1000 operang hours
Do the following checks aer one year or aer 1000 operang hours:
Check the integrity of all the adhesive labels;
Check the integrity of all the tubes (closing links, integrity of the protecve braided
wires, and the lack of hydraulic oil leaks or dras);
Substute the engine oil;
Substute the engine oil lter;
Substute the hydraulic oil in the tank and the concerning lter completely. For such
transporng consult the instrucons described in the concerning paragraph;
Check the automac return of the control levers and the carrying out of all the funcons;
Check the ghtening of the crawler tracks;
Check the wear-out and state of the crawler tracks, of the pinions, and of the inferior
rollers. For the check and the substuon of the crawler tracks follow the instrucons
described in the concerning paragraph. For the substuon of the pinions and the side
rollers it is advisable to consult the manufacturer;
Apply grease to all the present grease cups on the pile driver with the special pump. For
such maintenance, follow the described instrucons in the appropriate paragraph;
Clean the chain and grease its links;
Check the presence and the integrity of the hold-downs and the security devices;
Check the locking of all the nuts and bolts;
Check the state of the whole carpentry;
Check the liquid level in the baery;
Consult the manual of the engine and the hammer for relave task;
Yearly check or aer 2000 operang hours
Note: At 2000 hours please drain and replace all the oils on the nal drives and the hydraulic
system along with lters.
2 Rubber Track Equipment Maintenance Tips
So when you’ve decided to use rubber tracks on your machinery, what can you do to not
only make the job easier and faster but also keep your rubber tracks in good operating
condition for a much longer time? The following is a guide to rubber track maintenance.

Table of Contents