EasyManua.ls Logo

Quantum 800 - Maintenance to Carry out after 250 Operating Hours

Quantum 800
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© İnnosis Makine 46
Check all the nuts and bolts for ghtness.
Check all rollers on the track frame for oil leaks and wear. Check the state and the
integrity of the pile extractor
Consult the engine and hammer manual for relave tasks
Maintenance to carry out aer 50 operang hours:
All Engine and Hydraulic Oil Filters must be changed.
1.3- Maintenance to carry out aer 250 operang hours.
Aer about 250 operang hours (running), it will be necessary to substute the engine oil, the
engine oil lter and the hydraulic oil lter. For such task follow the instrucons described in the
appropriate paragraph of the present manual.
Checks and maintenance to carry out every 250 operang hours
Do the following checks aer 250 operang hours and every 250 working hours:
Change the engine oil.
Change all oil lters.
Check and restore the nitrogen level of the hammer (25-30 bar)
Check the condion of all the adhesive labels, and replace as needed.
Check the condion of all the hoses for damage or leaks .
Check the automac return of the control levers and the carrying out of all the
funcons.
Check the hydraulic oil level in the tank by using the sight glass, should be ½ ll.
Check the oil level in the Track nal drive units.
Check the ghtening of the crawler tracks.
Check the wear-out and the state of the crawler tracks. For the check and the
substuon of these tracks, consult the instrucons described in the relave paragraph.
Apply grease to all the present grease nipples on the Pile Driver with the hand pump.
Clean the chain and oil as required.
Check the anchorage pins at each end of the li chain for wear and replace them if
damaged. Replace each 12 months period.
Check all the nuts and bolts to ensure these are ght.
Check the liquid level in the baery.
Check the state and the integrity of the pile extracon chain;
Consult the engine and hammer manual for the concerning transporng.
Checks and maintenance to carry out every 500 operang hours

Table of Contents