© İnnosis Makine 20
Before placing the machine in the construcon site and starng to use it, it is essenal to
establish where the pile driving or the drilling should be done. Make sure there are no
underground service lines, as for example, water conducon pipelines, gas or combusble oil
lines, electrical lines, opcal waveguide nets, phone lines or other kind of service nets.
Therefore, it is necessary to contact the owner of the ground or the responsible government
society, in order to supply precise informaon or detailed maps of the working area. However,
in presence of underground lines, it is obligatory to have presence of an authorised technician
of the responsible government society during the operaon.
For electrical high tension lines, in the working area, it is necessary to observe that between the
cable lines and the highest part of the pile driver exists a minimum safety distance (which can be
dierent in every country, because of diversity of climate and moisture in the air. It is advisable
to follow the indicaons menoned in the table 1). If the distance should be smaller, the
responsible owner of the ground must be contacted, in order to raise the line or to install the
appropriate protecon.
Note: We strictly advise to consult with a local authority regarding the local rules and regulaon
whenever it applies.
Table 1. Advisable indications on distance based on the cable voltage
Minimum distance to be kept
1,0 kV (distribution line)
33 kV (min. 3 insulators)
66 kV (min. 6 insulators)
154 kV (min. 10 insulators)
275 kV (min. 19 insulators)
The Pile Driver can operate in a vast range of temperatures, (see use in cold climate) but should
be used during dayme only. It is NOT supplied with a proper lighng system, but this can be
ed. If for dierent reasons the Pile Driver should be used during the night, it is mandatory