EasyManua.ls Logo

Quantum 800 - Page 20

Quantum 800
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© İnnosis Makine 20
Before placing the machine in the construcon site and starng to use it, it is essenal to
establish where the pile driving or the drilling should be done. Make sure there are no
underground service lines, as for example, water conducon pipelines, gas or combusble oil
lines, electrical lines, opcal waveguide nets, phone lines or other kind of service nets.
Therefore, it is necessary to contact the owner of the ground or the responsible government
society, in order to supply precise informaon or detailed maps of the working area. However,
in presence of underground lines, it is obligatory to have presence of an authorised technician
of the responsible government society during the operaon.
For electrical high tension lines, in the working area, it is necessary to observe that between the
cable lines and the highest part of the pile driver exists a minimum safety distance (which can be
dierent in every country, because of diversity of climate and moisture in the air. It is advisable
to follow the indicaons menoned in the table 1). If the distance should be smaller, the
responsible owner of the ground must be contacted, in order to raise the line or to install the
appropriate protecon.
Note: We strictly advise to consult with a local authority regarding the local rules and regulaon
whenever it applies.
Table 1. Advisable indications on distance based on the cable voltage
Voltage of the cables
Minimum distance to be kept
1,0 kV (distribution line)
5 mt
6,6 kV (2÷3 insulators)
5,2 mt
33 kV (min. 3 insulators)
5,5 mt
66 kV (min. 6 insulators)
6 mt
154 kV (min. 10 insulators)
8 mt
275 kV (min. 19 insulators)
10 mt
The Pile Driver can operate in a vast range of temperatures, (see use in cold climate) but should
be used during dayme only. It is NOT supplied with a proper lighng system, but this can be
ed. If for dierent reasons the Pile Driver should be used during the night, it is mandatory

Table of Contents