EasyManua.ls Logo

Quantum 800 - Page 37

Quantum 800
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© İnnosis Makine 37
Fig.18 Phase 4 of driving
Pile Extracon
A metallic bar will be inserted in the lateral holes of the pile, as shown in the gure. The bar
will be the connecon pin for the extracon. Aached to this and to the lateral hooks of the
hammer group will be the pile extracon chain, as shown in gure 19, operang as a e rod.
Acvang the concerning lever the column will be hoisted. The column will li the hammer
group as well as the pile. The extracon process nishes with the exiling of the pile.

Table of Contents