© İnnosis Makine 39
• To make the transporng phase easier, it is necessary that the machine assumes the
transport conguraon, as showed in gure 20, and then the engine has to be switched
o
Fig.20 Conguraon of transport and movement
• Insert one hand in the pile hammer template (1) so the pile hammer will be pushed up
with the purpose of inserng a bearing pin (2) in the appropriate hole, as shown in the
g.21, in order to block the descent of the pile hammer;
• Next, the operator removes only two of the screw nuts, shown in the gure (3), that x
the pile hammer template to the structure of the hammer group without extracng the
pins
• The operator then inserts the dilator bolt with screw nut into the structure of the
hammer group, as shown in the gure (4). Then the operator will acvate the screw nut
placed on the same bolt, (5) with a key. Such acon opens the sides of the hammer group
structure and makes it easy to remove the pile hammer template;