a.
In SO menu press [3] to enter into
PartLine SO function.
b.
Set up the baseline. Sight the target,
and press [MSR1]/[MSR2] to start
survey. System set up a base line
between the instrument and the
measured point.
c.
Enter the total stake number in Partition
field, and press [ENT]. ※1)
Enter the total
stake number
[ENT]
d.
The observation screen for the first
stake (from the instrument) appears.
Sight the prism and press [MSR1]/
[MSR 2].
Sight the first
stake out point
+
[ENT]
e.
When the measurement is completed,
the differences between the target
position and the stakeout point are
displayed. ※2), ※3)
HA: Difference in horizontal angle to the
target point
R/L: Right/Left (Lateral error)
IN/OUT: In/Out (Longitudinal error)
f.
Ask the rodman to adjust the target
position. When the target is on the
intended position, the displayed errors
become 0 m.
:moving towards to station
:moving away from station