EasyManua.ls Logo

Rlide R2 Series - Start Survey

Default Icon
159 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
b.
Input note and then press [ENT]. The
instrument returns to the basic
measurement screen.
Input Note
Input Note
1
OK
3.4 START SURVEY
After finishing all settings, you can start surveying. The survey result is displayed in 4 pages including all
data of routine survey. Press DSP to view. If the 2nd unit is set, a HD/VD/SD screen will appear.
Please set a job, station and backsight azimuth before measurement.
STEP
OPERATION
DISPLAY
a.
Collimate to the center of target prism,
press [MSR1] or [MSR2].
[MSR1]/
[MSR2]
Display
1/4
HA#
30°2150”
VA#
273°1345
SD#
PT:1
HT:
1.000m
b.
While the instrument is taking a
measurement, the prism constant is
displayed in a small font.
Display
1/4
HA#
30°2150”
VA#
273°1345
SD#
<-30mm>
PT:1
HT:
1.000m
c.
Display the result of measurement in
four pages, including all normal
measure functions such as measure of
angle, distance and coordinate, etc.
Press [DSP] or []/[] to view each
page.
*If the secondary distance unit is set,
another page will display.
DSP
or
[]/[]
First page:
Display
1/4
HA#
30°2150”
VA#
273°1345
SD#
2.201m
PT:1
HT:
1.000m
Second page:
Display
2/4
AZ#
30°2150”
HD#
2.274m
VD#
-0.185m
PT:1
HT:
1.000m

Table of Contents