EasyManua.ls Logo

Robinsons R66 - 71-30 Exhaust Weldment

Robinsons R66
654 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
71-30 Exhaust Weldment
Refer to R66 Illustrated Parts Catalog (IPC) Figure 71-13.
A. Removal
1. Remove engine cowling assembly per § 53-21.
2. Refer to Figure 71-4. Remove hardware securing F173-1 struts to F169-1 exhaust
weldment and engine, and remove struts.
3. Loosen clamp(s) securing (accessory gearbox vent) tubes/hose to exhaust; pull tubes/
hose off of exhaust weldment.
4. Remove three fasteners securing exhaust weldment to engine exhaust collector.
Carefully lift exhaust weldment up and off of F169-2 base flange, and remove exhaust
weldment.
5. As required, remove hardware securing base and F577-5 bracket (early R66s) to
exhaust collector and remove base. Install exhaust collector cover.
B. Installation
1. Refer to Figure 71-4. If F169-2 base is installed, proceed to step 3. Verify base and
engine exhaust collector mating surfaces are clean and dry, and lay 0.25 inch bead
7020-3 ceramic putty on top of exhaust collector flange.
2. Position F169-2 base and F577-5 bracket (early R66s) on exhaust collector and install
hardware. Verify security. Remove excess putty.
3. Position F169-1 exhaust weldment on base and install three fasteners securing exhaust
weldment to exhaust collector.
4. Install hardware securing F173-1 struts to exhaust weldment and engine. Special
torque engine tee-bolts per § 20-33.
5. Position (accessory gearbox vent) tubes/hose with clamp(s) over exhaust weldment
vent tube. Orient clamp screw(s) (and any slight bunching of hose, early R66s) is on
top within 30°, and tighten clamp(s). Verify security.
6. Install engine cowling assembly per § 53-21.
MAY 2015 Chapter 71 Powerplant Page 71.15

Table of Contents