EasyManua.ls Logo

Roche Cedex Bio System - Page 484

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
F-14 Operator’s Manual · Version 3.1
Index Cedex Bio System
End of Shift short guide, B–78
environment, specifications, A–65
error messages, reacting to, D–44, E–80
exceptional situations
ISE unit, E–80
main instrument, D–42
exchanging reagents, B–25
expanding lists, A–74
export, screen, A–115
exporting
alarm message log, D–9
database, B–104
diagnostics data, D–51
log files, B–110
results, B–83, B–105
external bottle status, screen, A–93
external waste container, A–51
extra wash cycles
activating, B–169
deactivating, B–169
defining, B–168
definitions, B–170
deleting, B–169
importing, B–115
screen, A–110
F
features of instrument, A–17
filtering, A–76
finishing the shift, B–77
flags
Abs. results, D–28
ISE results, E–71
overview, D–25
priorities, D–26
viewing details, D–25
flaps
instrument, A–39
ISE unit, E–9
fluid system
overview, A–45
–priming, C11
fluids
bottles, A–50
bottles for ISE, E–11
checking external containers, B–15
connecting external cleaner bottle, B–128
connecting waste container, B–128
connecting water container, B–127
external connectors, A–47
ISE, E–8
replacing ISE bottles, E–22, E–30
forecast period, A–29
fuses, A–64
changing for mains, D–47
changing low voltage, D–49
G
global action buttons, A–71
H
handling
cuvettes, A–55
lots, B–98
orders, A–31
reagents, A–24, A–56
results, A–33
–samples, A30
software data, A–66
hardware
overview, A–37
specifications, A–65
heads, transfer, A–48
heating channel, cleaning, C–10
host
configuration, B–163
connectivity, A–32
definitions, B–163
host codes, B–160
screen, A–110
housing, cleaning, C–21
I
ignoring QC results, B–74
import, screen, A–114
importing
applications, B–111, B–137
certificates, B–115
database, B–113
extra wash cycles, B–115
mixing information, B–115
software, B–113
Initialize ISE reference sensor, maintenance action, E–47
Initialize ISE unit, maintenance action, E–53
installation, safety, A–7
installing
applications, B–112, B–138
ISE pump tubing, E–54
ISE unit tubing, E–61

Table of Contents

Related product manuals