Roche Diagnostics
F-14 Operator’s Manual · Version 3.1
Index Cedex Bio System
End of Shift short guide, B–78
environment, specifications, A–65
error messages, reacting to, D–44, E–80
exceptional situations
– ISE unit, E–80
– main instrument, D–42
exchanging reagents, B–25
expanding lists, A–74
export, screen, A–115
exporting
– alarm message log, D–9
– database, B–104
– diagnostics data, D–51
– log files, B–110
– results, B–83, B–105
external bottle status, screen, A–93
external waste container, A–51
extra wash cycles
– activating, B–169
– deactivating, B–169
– defining, B–168
– definitions, B–170
– deleting, B–169
– importing, B–115
– screen, A–110
F
features of instrument, A–17
filtering, A–76
finishing the shift, B–77
flags
– Abs. results, D–28
– ISE results, E–71
– overview, D–25
– priorities, D–26
– viewing details, D–25
flaps
– instrument, A–39
– ISE unit, E–9
fluid system
– overview, A–45
–priming, C–11
fluids
– bottles, A–50
– bottles for ISE, E–11
– checking external containers, B–15
– connecting external cleaner bottle, B–128
– connecting waste container, B–128
– connecting water container, B–127
– external connectors, A–47
– ISE, E–8
– replacing ISE bottles, E–22, E–30
forecast period, A–29
fuses, A–64
– changing for mains, D–47
– changing low voltage, D–49
G
global action buttons, A–71
H
handling
– cuvettes, A–55
– lots, B–98
– orders, A–31
– reagents, A–24, A–56
– results, A–33
–samples, A–30
– software data, A–66
hardware
– overview, A–37
– specifications, A–65
heads, transfer, A–48
heating channel, cleaning, C–10
host
– configuration, B–163
– connectivity, A–32
– definitions, B–163
host codes, B–160
– screen, A–110
housing, cleaning, C–21
I
ignoring QC results, B–74
import, screen, A–114
importing
– applications, B–111, B–137
– certificates, B–115
– database, B–113
– extra wash cycles, B–115
– mixing information, B–115
– software, B–113
Initialize ISE reference sensor, maintenance action, E–47
Initialize ISE unit, maintenance action, E–53
installation, safety, A–7
installing
– applications, B–112, B–138
– ISE pump tubing, E–54
– ISE unit tubing, E–61