EasyManua.ls Logo

Roche cobas b 221 system

Roche cobas b 221 system
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics May 2009
Service Manual · Version 9.0 A-25
cobas b 221 system 2 Fluid actions
Measurement
Aspirating MSS standby solution and starting FMS
The MSS is positioned in four subsections:
Preconditioning by aspiration of
standby solution (1)
This process is done before aspiration of the sample. A little reference solution is
aspirated via V8 and the MSS reference electrode and is checked with the conductivity
section at the MSS output.
e
For more information, see Aspirating MSS reference solution, calibration with standby
solution on page A-39.
Then the measuring chamber is filled with standby solution.
A MSS output pump
B MSS input pump
C Aspirating MSS standby solution
D CAL B
E CAL A
F Starting FMS
G MSS standby solution
Figure A-13 Aspirating MSS standby solution and starting FMS
ABC
G
F
E
D

Table of Contents

Related product manuals