EasyManuals Logo

Shimadzu GCMS-QP2010 User Manual

Shimadzu GCMS-QP2010
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #133 background imageLoading...
Page #133 background image
200-33168
Seal Teflon
As required Consumable
036-15550-12
Oring,AS568A-012 4D
As required Consumable
225-09344
Sample vacuum bottle
As required Consumable
225-04209
cap
As required Consumable
225-10627-91
DI PROBE ASSY
As required Consumable
DI
225-10618-91
REPELLER2,CI+(C)
IN DI mode ,CI analysis
As required Consumable
225-09493-03
STANDARD SAMPLE (PFTBA) 5g
As required Consumable
STANDAR
DSAMPLE
225-09493-01
STANDARD SAMPLE (TRIAZINE) 0.5g
As required Consumable
Consumable
VACUM
SYSTEM
017-30163-11
ROTARY PUMP OIL ULTRAGRADE15 1L 0.28L per oil replacement 1L/year (#5)
Consumable
085-35124-03
SCOTCHBRITE (for finishing electrodes) set of 20 sheets
20 sheets/year
225-10194-91
JIG, IS
Service part
225-01453-94
COLUMN MOUNTING JIG (I/F)
Tools and
jigs
225-01453-95
COLUMN MOUNTING JIG (INJ)
#1 Replace after approximately 80 injections.
#2 If carrier gas leaks or when glass insert is replaced.
#3
Replace periodically, normally once every 6 months. However, replace more frequently under
certain measurement conditions or after many analyses of samples with a high boiling-point or
samples that are solid at room temperature.
(See GC System User Guide for details.)
#4 Use when column is replaced.
#5 Ideally, replace oil once every three months (3000 hours operating time). Insufficient vacuum can cause various problems in the
mass spectrometer system. The oil must be replaced appropriately.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GCMS-QP2010 and is the answer not in the manual?

Shimadzu GCMS-QP2010 Specifications

General IconGeneral
BrandShimadzu
ModelGCMS-QP2010
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals