EasyManua.ls Logo

Siemens 3UG4 - 3.4 Mounting; removal

Siemens 3UG4
410 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System overview
3.4 Mounting / removal
3UG4 / 3RR2 monitoring relays
Manual, 05/2016, NEB927043002000/RS-AC/004
29
3.4
Mounting / removal
3.4.1
Mounting 3RR2 current monitoring relay
Mounting options
3RR2 current monitoring relays are matched to 3RT2 contactors and 3RF34 (size S0) solid-
state contactors in terms of their electrical and mechanical features. As a result, direct
mounting can be achieved easily.
Alternatively, the devices can also be installed individually in the case of stand-alone
assembly or if a 3RU2 / 3RB3 overload relay is being used at the same time. The
accessories required for separate mounting are described in Chapter "Terminal support for
stand-alone assembly (Page 324)."
Minimum clearance
The following minimum clearances from grounded and live parts must be complied with
when installing the 3RR2 monitoring relay:
At the side: 6 mm
Forward (on front): 6 mm
Mounting position
It can be mounted in any position.

Table of Contents

Related product manuals