221/232
Building Technologies Boiler sequence controller RMK770 CE1P3132en
HVAC Products 16 Addendum 23.04.2009
16.2 Editable texts
The following list of editable texts shall serve as an aid for engineering and commis-
sioning. The maximum text length is 20 characters.
On the password level, operating texts, such as menu, fault or datapoint texts can be
reset as follows:
Main menu > Settings > Texts
Operating line Adjustable values / display / remarks
Reset No / Yes
The texts of the datapoints “Device name“, “File“ and “Business card line 1…4“ on the
Texts menu are not deleted when making a reset.
16.2.1 Boiler sequence manager
Main menu > Settings > Boiler sequence manager > Fault settings > Fault input 1
Datapoint name Factory setting
Fault text [Boiler seq] water shortage
Main menu > Settings > Boiler sequence manager > Fault settings > Fault input 2
Datapoint name Factory setting
Fault text [Boiler seq] overpressure
Main menu > Settings > Boiler sequence manager > Fault settings > Fault input 3
Datapoint name Factory setting
Fault text [Boiler seq] underpressure
16.2.2 Boilers
Main menu > Settings > Boiler 1 (or 2…6)
Datapoint name Factory setting
Boiler 1: Boiler 1
Boiler 2: Boiler 2
Boiler 3: Boiler 3
Boiler 4: Boiler 4
Boiler 5: Boiler 5
Boiler 6: Boiler 6
Main menu > Settings > Boiler 1 (or 2…6) > Fault settings > Fault input 1
Datapoint name Factory setting
Fault text [Bx] water short
Main menu > Settings > Boiler 1 (or 2…6) > Fault settings > Fault input 2
Datapoint name Factory setting
Fault text [Bx] overpressure
Main menu > Settings > Boiler 1 (or 2…6) > Fault settings > Fault input 3
Datapoint name Factory setting
Fault text [Bx] underpressure
Note